96% of apartment buildings in Uzbekistan are already prepared for winter
In Uzbekistan, preparations of the communal infrastructure for the autumn-winter season continue. To date, work has been completed in 6,431 out of 6,686 apartment buildings — this is 96% of the plan. 242 billion soums were allocated for the preparation of the buildings. 1,110 roofs, 6,234 entrances, 833 basements, utility networks in 433 buildings, and facades of 644 buildings have been repaired. In addition, 105 […] have been prepared.

96% of apartment buildings in Uzbekistan are already prepared for the winter period
In Uzbekistan, preparations of the utility infrastructure for the autumn-winter season continue. To date, work has been completed in 6,431 out of 6,686 apartment buildings, which constitutes 96% of the plan.
A total of 242 billion soums was allocated for the preparation of the buildings. Repairs have been carried out on 1,110 roofs, 6,234 entrances, 833 basements, utility networks in 433 buildings, and facades of 644 buildings.
Additionally, 105 emergency recovery teams, 116 units of special equipment, and 429 employees have been prepared to promptly resolve potential emergencies.

