Uzbekistan

Tashkent Ring Road Traffic Restricted for 40 Days

Traffic on a section of Tashkent’s Small Ring Road will be restricted for 40 days due to replacement of a main heating pipeline.

**Traffic Restrictions Imposed on Tashkent's Small Ring Road for 40 Days**

Tashkent, Uzbekistan (UzDaily.uz) —

A segment of Tashkent's Small Ring Road, located within the Yakkasaray district, will experience temporary traffic restrictions starting at 00:00 on July 25. This measure is being implemented to facilitate the replacement of a primary heating pipeline, as announced by the district administration.

The undertaking will be managed by Veolia Energy Tashkent LLC. Over a 40-day period, the company is scheduled to replace a main heating pipeline that measures 530 mm in diameter and extends for a total length of 1,540 meters.

During the construction phase, vehicle access will be partially limited on two lanes of the designated section of the Small Ring Road.

The district administration has advised motorists to plan their travel routes ahead of time and to utilize alternative detours whenever possible.

tashkentroadworksdriver advisorytraffic restrictionheating pipelineinfrastructure repair